Chenaux medium voltage systems testing and commissioning

Two coordinated phases on 2.4 kV systems for Champlain EPC / OPG.

Chenaux station (OPG, 144 MW) saw testing and commissioning of 2.4 kV systems for Champlain EPC across two phases: disconnects, transformers, 600 V boards, NGR systems (Bender), zero-sequence CTs and breaker contact resistance, with primary injection and per-phase reports.

Highlights

  • 2.4 kV system testing
  • Bender NGR verification
  • Zero sequence CT primary injection

Results

  • Methodical MV commissioning
  • Reports issued each phase