Otter Rapids I/O testing and point integration

Point-by-point control validation for ANDRITZ Hydro / OPG.

At Otter Rapids (OPG, 182 MW), FORWA carried out for ANDRITZ Hydro I/O testing and point integration per IFC documents, including excitation-related points, with OPG security clearance.

Highlights

  • I/O testing per IFC
  • Excitation point integration
  • OPG secured access

Results

  • Every I/O point verified before operation
  • Controls made dependable

A comparable mandate?

Describe the asset, the role you need and the site window.

Discuss a similar project