Otter Rapids I/O testing and point integration
Point-by-point control validation for ANDRITZ Hydro / OPG.
At Otter Rapids (OPG, 182 MW), FORWA carried out for ANDRITZ Hydro I/O testing and point integration per IFC documents, including excitation-related points, with OPG security clearance.
Highlights
- I/O testing per IFC
- Excitation point integration
- OPG secured access
Results
- Every I/O point verified before operation
- Controls made dependable
A comparable mandate?
Describe the asset, the role you need and the site window.